High (Mains) Pressure Installations


Download as PDF



Download as PDF

Installation to comply with NZBC Clause G12 (2001) or NZS 4607:1989

Acceptable solution G12/AS1

States that hot and cold water supply systems when outside the building thermal envelope shall be protected from freezing. (refer G12 clause  7.2.1 and AS/NZS 3500)

Therefore it essential that all Apex valves outside the building thermal envelope must also be protected from freezing and it is recommended best practise that valves are installed WITHIN a building thermal envelope.


Notes:

* If the drain exceeds a factor of 12 as a combination of length in meters and number of bends (e.g. 7 metres & 5 bends) we recommend the installation of an SVB vacuum break.

** 1.0m minimum copper pipe length from cylinder to Tempering Valve.