Application
Where water temperature control must be precise or water is required to be at safe skin contact temperature (45 degrees) e.g.
hospitals, aged care, kindergartens, hair salons. Thermostatic Mixing Valves can be used for single or multiple point
applications.
Standards
- Complies with NZBC Clause G12 (2001)
- Complies with NZS 4617:1989
- Complies with BS 7942:2000
Specifications
| Overall length: |
| TMV20 |
110mm |
| TMV20BV |
185mm (center-to-center ball valves) |
| Inlets: |
| |
Hot Inlet |
Cold inlet |
| TMV20 |
20mm, ¾" BSP (male) |
20mm, ¾" BSP (male) |
| TMV20BV |
20mm, ¾" BSP (male) |
20mm, ¾" BSP (male) |
| Outlet: |
| TMV20 |
20mm, ¾" BSP (male) |
| TMV20BV |
20mm, ¾" BSP (male) |
- TMV-20 strainers (60 mesh, 250 micron)
- TMV-20-BV strainers (60 mesh, 250 micron) & isolating valves
- Factory set to 45˚C
- Min. setting 35˚C
- Cold supply 5 – 30˚C
- Hot supply 60 - 99˚C
- Min. differential between hot supply and set temperature 10˚C.
- Min. supply pressure 50kPa
- Max. supply pressure 1600 kPa static, 500 kPa dynamic.
- Flow rate 40 l/min at 500 kPa
- Max. pressure imbalance between the hot & cold supplies 5:1
- Forged, high quality, corrosion resistant DR brass body, nickel plated.
Flow Chart
Performance Chart
Installation
- Refer to Technical Area for
installation guide.
- Valve to be installed by a qualified plumber.
- Installation must comply with local authority requirements.
- Valve may be installed in any orientation.
- Flush pipes prior to fitting.
- Connections are H (hot inlet) C (cold inlet) and OUT (tempered outlet).
- Do not apply heat near valve during installation.
- Do not install directly into cylinder outlet.

Caution
Valves not installed in accordance with these instructions may result in unsafe performance.
Commissioning
- The outlet temperature must be set on site.
- It should be set to and verified using a thermometer.
- Remove cap.
- Use a screwdriver to adjust to desired temperature with the water running.
- Turn anti-clockwise to increase the temperature.
Testing and Maintenance
- Testing should be carried out at least every 12 months. Note that the owner, occupier or facility manager needs to be notified
that testing is being carried out and measures shall be taken to ensure safety during the testing.
- Check cleanliness of strainers and non-return valves; check non-return valve operation.
- Check the discharge temperature at the nearest outlet at both high and low flow using a thermometer with an accuracy of +/-
0.5˚C. Record the test results and the location of the valve. Isolate the cold supply and check that the thermostatic mixing valve
shuts down the hot supply.
- If a valve is found to be faulty during testing, it must be replaced.
- The thermostatic mixing valve shall be replaced at intervals not exceeding 5 years.
Servicing of the internals of the valve is limited to replacement of the complete unit.
|
|
 |
 |
 |


Brochure
Download the Thermostatic Mixing Valve brochure and Technical Data sheet as a PDF* or contact us to have
them sent to you.

Download Flyer as PDF


Download Data Sheet as PDF

*Requires Adobe Acrobat Reader to be installed.
Product Codes
| TMV20 |
20mm Standard Valve |
| TMV20BV |
20mm Standard Valve & Right Angle Ball Valves |
|